   【高顿ACCA小编】2015年ACCA考试即将开始,我们将第一时间公布考试相关内容,请各位考生密切关注高顿ACCA,预祝大家顺利通过ACCA考试。今天为大家带来的是Contingent Liabilities and Contingent Assets

  1. Objective
 
  To ensure that appropriate recognition criteria and measurement bases are applied to:
 
  provisions;
 
  contingent liabilities; and
 
  contingent assets.
 
  To ensure that sufficient information is disclosed in the notes to the financial statements in respect of each of these items.
 
  2. Scope
 
  The rules will apply to all provisions and contingencies except for those covered by more specific requirements in other IFRSs. For example:
 
  IAS 11 Construction Contracts;
 
  IAS 19 Employee Benefits;
 
  IAS 12 Income Taxes
 
  IAS 17 Leases; and
 
  IFRS 3 Business Combinations.
 
  3. Terminology
 
  Provisions: liabilities of uncertain timing or amount.
 
  Liability: a present obligation of the entity arising from past events, the settlement of which is expected to result in an outflow from the entity of resources embodying economic benefits.
 
  Obligating event: an event which creates a legal or constructive obligation which results in an entity having no realistic alternative to settling that obligation.*
 
  Legal obligation: an obligation which derives from:
 
  a contract;
 
  legislation; or
 
  other operation of law.
 
  Constructive obligation: an obligation which derives from an entity's actions where:
 
  by an established pattern of past practice, published policies or a sufficiently specific current statement, the entity has indicated to other parties that it will accept certain responsibilities; and as a result, the entity has created a valid expectation on the part of those other parties that it will discharge those responsibilities.
 
  Contingent liability:
 
  a possible obligation which arises from past events and whose existence will be confirmed only on the occurrence or non-occurrence of one or more uncertain future events, which are not wholly within the control of the entity; or
 
  a present obligation which arises from past events but is not recognised because:
 
  — it is not probable that an outflow of benefits embodying economic benefits will be required to settle the obligation; or
 
  — the amount of the obligation cannot be measured with sufficient reliability.*
 
  Contingent asset: a possible asset which arises from past events and whose existence will be confirmed only on the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.
 
  Onerous contract: a contract in which the unavoidable costs of meeting the obligations under the contract exceed the economic benefits expected to be received from it.
 
  Restructuring: a programme which is planned and controlled by management, and materially changes either:
 
  = the scope of a business undertaken by an entity; or
 
  = the manner in which that business is conducted.
 
  4. Relationship Between Provisions and Contingent Liabilities
 
  In a general sense, all provisions are contingent because they are uncertain in timing or amount.
 
  The standard distinguishes between:
 
  provisions, which are present obligations; and
 
  contingent liabilities, which are not recognised because they are either:
 
  — only possible obligations; or
 
  — present obligations, which cannot be measured with sufficient reliability.

      本文由高顿ACCA编辑整理,转载请注明出处

推荐:考生都在用的ACCA资料>>【领取2023ACCA完整资料】 (资料包含ACCA必考点总结,提升备考效率,加分必备)

版权声明:

1、凡本网站注明“来源高顿ACCA”或“来源高顿、ACCA学习帮”,的所有作品,均为本网站合法拥有版权的作品,未经本网站授权,任何媒体、网站、个人不得转载、链接、转帖或以其他方式使用。

2、经本网站合法授权的,应在授权范围内使用,且使用时必须注明“来源高顿ACCA”或“来源高顿、ACCA学习帮”,并不得对作品中出现的“高顿”字样进行删减、替换等。违反上述声明者,本网站将依法追究其法律责任。

3、本网站的部分资料转载自互联网,均尽力标明作者和出处。本网站转载的目的在于传递更多信息,并不意味着赞同其观点或证实其描述,本网站不对其真实性负责。

4、如您认为本网站刊载作品涉及版权等问题,请与本网站联系(邮箱fawu@gaodun.com,电话:021-31587497),本网站核实确认后会尽快予以处理。

急速通关计划 ACCA全球私播课 周末面授班 其他课程
  • 周末面授班 免费试听 课程咨询
  • 周末精品面授班 免费试听 课程咨询
  • 相关推荐
    报考指南
    最新ACCA备考机经
    价值1288元 考试必备资料
    免费领取 高顿ACCA研究院独家出品
    领取ACCA资料包